The Old Gotthard Tunnel Route - Driver's Eye View (2018)

ALL 10/01/2018 (en) Documentary 112 Min
  • Release
    10/01/2018
  • Production
    Video 125
  • Rotten tomato
    0%
  • Original title
    The Old Gotthard Tunnel Route - Driver's Eye View
  • Original language
    en
  • Production Cost
  • 0.00
    -

Overview

The original Gotthard railway tunnel through the Swiss Alps, took ten years to build and cost 147 lives. It was a mammoth undertaking and required the construction of long ramps on either side totalling 85 miles. Dozens of tunnels, viaducts and bridges were necessary. The ruling gradient of 1 in 37 was deemed to be just about the maximum that the original steam locomotives could handle, even then, trains were usually double-headed and even had banking engines attached at the rear! In order even to keep to this severe gradient, the engineers had to construct a number of additional spiral tunnels to gain height, hewn out of solid rock…

  1. Director

  2. Story

  3. Editor

  4. Peter Middleton

    Producer



Currently available to stream, watch for free, rent, and buy in the United States. You can makes it easy to find out where you can legally watch your favorite movies & TV shows online.

Watch Channel

Casts

  1. Jonathan Kydd

    Narrator

Full Cast & Crew

Casts : 1 , Crews : 2

Keyword

The Old Gotthard Tunnel Route - Driver's Eye View (2018) 112 Min

ALL 10/01/2018 (en)
Documentary
  • Release 10/01/2018
  • Production
    Video 125
  • Original title The Old Gotthard Tunnel Route - Driver's Eye View
  • en
  • Revenue0.00

Overview

The original Gotthard railway tunnel through the Swiss Alps, took ten years to build and cost 147 lives. It was a mammoth undertaking and required the construction of long ramps on either side totalling 85 miles. Dozens of tunnels, viaducts and bridges were necessary. The ruling gradient of 1 in 37 was deemed to be just about the maximum that the original steam locomotives could handle, even then, trains were usually double-headed and even had banking engines attached at the rear! In order even to keep to this severe gradient, the engineers had to construct a number of additional spiral tunnels to gain height, hewn out of solid rock…

  1. Director

  2. Story

  3. Editor

  4. Peter Middleton

    Producer